How Heated Sample Lines Improve Emission Control in Hazardous Areas
Published 07 Jul 2025
Project Spotlight – Heated sample lines (Process Emission Control) – Dubai
Project: Sample Analytics Form (Process Emission Control)
Location: Dubai, UAE
Scope of Supply:
-
Engineering & Design (EP)
-
Procurement of Sample Analytic Lines for Emission Control and Monitoring
-
Supply of Heated Hoses with Series Heating Cable
-
Integrated temperature sensors for precise monitoring (up to 160°C)
-
Hazardous area-rated components with Ex-Control Systems
-
Power distribution boxes for controlled and reliable system operation
Application:
The heated sample line system was designed for critical emission control and monitoring applications in a hazardous environment. The solution ensured sample integrity through heated transfer lines, preventing condensation and enabling accurate gas analysis.
Technical Highlights:
-
Heated hoses designed for 160°C operating range
-
Ex-rated instrumentation for hazardous zones
-
Integrated temperature control and safety systems
-
Power distribution tailored for site-specific requirements
Year of Supply: 2019
Outcome:
The heated sample lines provided Petroleum Development Oman with a robust, safe, and compliant solution for emission control analytics, supporting environmental monitoring efforts in line with regional regulations and internal ESG goals.
Need A Trace Heating Solution?
With more than four decades of industry expertise, Thorne & Derrick are recognised leaders in delivering specialist trace heating solutions for a wide range of industrial applications. From hazardous zones and extreme climates to critical process control systems, we design bespoke solutions tailored to the specific needs of your operation.
Our services include comprehensive in-house heat loss analysis, system design, and technical specification, backed by a commitment to engineering excellence. Using only premium, market-leading heat trace cables and components, we provide cost-effective systems that enhance operational efficiency, minimise downtime, and support long-term project reliability—from initial concept through to full commissioning.